Maintenance tickets and meter replacement
A ticket follows a fault from report to repair. A meter replacement request has the owner approve a nozzle’s new meter reading.
Reviewed 14 October 2026
Who this is for
Station managers, shift supervisors, inventory managers, regional managers and owners open tickets. Technicians do the work. Only the owner approves a meter replacement.
Before you begin
Note the station, the equipment and what you observe. If the equipment is dangerous, stop it first: a ticket does not replace safety rules.
1Open and assign a ticket
- Open More → Maintenance.
- In “Open maintenance ticket”, choose the “Station” and fill in “Fault or work required”.
- Add the “Description and safety measures”, choose the “Priority”, then select “Open maintenance ticket”.
- A station manager, inventory manager, regional manager or the owner picks a technician authorized for that station, then selects “Assign technician”.
The ticket is “Open”. The assigned technician sees it in their list and in their “Inbox”.
2Do the work (technician)
- Open the ticket on the website (More → Maintenance) or in the FuelOps app.
- Select “Start work”: the ticket becomes “In progress”.
- After the repair, describe the work done in “Work performed or cancellation reason”.
- Select “Resolve ticket”.
The ticket is “Resolved” with your note. A manager can also “Cancel ticket”, with a written reason.
3Request a meter replacement (technician)
- In the FuelOps app, open “Meter replacement”.
- Choose the station, pump and nozzle. No shift may be open on that pump.
- Enter the new meter reading and the reason for the replacement.
- Add a photo of the new meter, then “Capture location” at the station. If location fails, use “Record this reason and continue”.
- Select “Submit for review”.
The pump is blocked until the owner decides, and the owner receives a notification.
4Approve or reject a replacement (owner)
- Open More → Meter Resets, “Pending” tab.
- Check the new reading, the reason, the photo and the location evidence.
- Select “Approve”, or “Reject” and write the reason.
- Approval is not possible while a shift is open on the pump.
In both cases the pump is unblocked and the technician is notified. If you approve, the new reading becomes the nozzle’s starting point.
A practical example
A broken meter is replaced by a new one showing 0.00. The technician sends the request with 0.00 as the new reading and a photo. The owner approves: the nozzle starts again from 0.00.
If something goes wrong
The technician cannot see a ticket
A technician only sees tickets assigned to them. Check the assignment and that they are authorized for that station.
The technician cannot open a ticket
This is by design: a manager or shift supervisor opens the ticket, then a manager assigns it.
The replacement request is refused
Check that no shift is open on the pump and that no other request is waiting for that nozzle. If the station has GPS coordinates, capture your location on site.
Open the relevant screen
Sign in with your own account. Your permissions still apply.
Open the relevant screen →